CPP Smeaton Grange Substation

In 2015 our client contracted Milleen to carry out the structural/civil contract for the construction of a new 66/11kV substation for a private client in Smeaton Grange NSW.

Transgrid Mandalong Transmission Line 24 Cruciform Footings

In 2016, our client Transgrid contracted Milleen construct 3x new cruciform foundations on 3 existing 330kV Transmission towers. Each foundation was in excess of 100 m3 of concrete and required temporary support of the towers whilst modifications to the tower legs were carried out.

arrow element
arrow element

T&C PWS Floodplain

2015

Downer Vales Point Pumping Station

2017

arrow element
arrow element

Zinfra Mandalong Transmission Line Cruciform

2017

Zinfra Sapphire Wind Farm Substation

2017

arrow element
arrow element

Orica Capping

2019

KCE Mandalong Power Station

2020

arrow element
arrow element

Mt Pleasant TLO

2021

Orica NAP1

2021

arrow element
arrow element

Stockdill VNI

2021

SPEED AT SCALE PROJECTS

Here are some of our completed projects that we are proud to share with you.

arrow element

Tank Industries PWCS Tank Bases

2017 and 2021

Downer Ravensworth North Project

2012

arrow element
arrow element

Beon Jemalong Solar Farm

2020

CPP Mt Lock Wind Farm Switchyard

2015

arrow element
arrow element

Infrabuild 2021

2021

INNOVATIVE SOLUTIONS PROJECTS

Here are some of our completed projects that we are proud to share with you.

arrow element

Smeaton Grange Substation

Our client contracted Milleen to carry out the structural/civil contract for the construction of a new 66/11kV substation for a private client in Smeaton Grange NSW.

Parramatta River Boardwalk Pile Driving

Our client contracted Milleen to carry out installation of turpentine marine piles from a barge on the Parramatta River. This involved loading of our 26t excavator onto the barge by crane at hte Sydney cruise ship terminal, transportation up the river by barge & installation of piles. All this was carried out while co-ordinating with the river cat service, and with minimal disturbance to the mangrove swamp covering the river banks. These piles provide a solid foundation for a new viewing boardwalk for the Promenade No2 Development.

arrow element
arrow element

Sapphire Wind Farm 330kV S/Station Bulk Earthworks & Drainage

Our client contracted Milleen to carry out the bulk earthworks & drainage contract for the construction of a new 330/33kV substation as part of the Sapphire Wind Farm Project, just outside Glenn Innes NSW.

AJ Lucas 12ML Reservoir

2010

arrow element
arrow element

CPP Newcastle 330kV Substation Rebuild

2013

Orica Demin Bund

2013

arrow element
arrow element

Onesteel Rooty Hill Detention Tank

2016

Mandalong Transmission Line 24 Cruciform Footings stage 1

Our client Transgrid contracted Milleen construct 3x new cruciform foundations on 3 existing 330kV Transmission towers. Each foundation was in excess of 100 m3 of concrete and required temporary support of the towers whilst modifications to the tower legs were carried out.

arrow element
arrow element

MELP Dungog Water Tank

2019

PWCS Pond Revetment

2020

arrow element

GALLERY

View more of our projects in our gallery.