Overview
Milleen Constructions delivered specialist civil works for the pond revetment system at the Port Waratah Coal Services (PWCS) Newcastle terminal. These works form part of ongoing infrastructure improvements designed to strengthen water management assets, enhance erosion control, and extend the operational resilience of the terminal.
Scope of Works
- Detailed earthworks and preparation of pond embankments
- Placement of engineered rock armour and geofabric lining
- Construction of reinforced concrete headwall and supporting elements
- Integration of drainage and erosion protection systems
- Delivery under strict environmental and operational controls within a live coal export facility
Outcome
The completed revetment system provides long-term stability, erosion resistance, and improved environmental performance for PWCS’s critical water infrastructure. Milleen Constructions delivered the works safely and efficiently, ensuring minimal disruption to ongoing operations while supporting PWCS’s focus on sustainable and reliable coal terminal management.