2017 and 2021
Share this project
Sandvik – Manufacturing Facility Upgrade
2025
Eraring Battery Energy Storage System (BESS)
Infrabuild Newcastle – Mesh Manufacturing Facility
Incitec
2024
Culcairn TL footings
The Eraring Battery Energy Storage System OHTL
Waratah Super Battery Transmission Line
Bango Wind Farm Harmonic Filter Bay
2023
Orica Ammonia Plant High Temperature Shift (HTS)
Orica Nitric Acid Plant Tertiary Abatement Scheme
Orica Prill Tower Emissions Abatement Scheme
Stockdill Substation VNI Upgrade
2021
Orica KI NAP1 Stack Replacement
Mt Pleasant Train Load Out
Infrabuild Newcastle East Mill Upgrade
Tank Industries PWCS Tank Bases
TL Line 24 STR 39, 40, 41 & 42 Cruciform
Jemalong Solar Farm Substation & Civil Works
2020
PWCS Pond Revetment Works
Centennial Coal – Mandalong Power Station (WCMG)
Tomago 9C6 Wooden Pole Replacement
2019
Dungog Water Treatment Plant – Reservoir Construction
Orica KI – Arsenic Capping & Remediation
Mandalong TL24 Deviation
2018
Mandalong Transmission Line 24 Cruciform Footings
2017
Sapphire Wind Farm 330kV S/Station Bulk Earthworks & Drainage
Vales Point Power Station – Fly Ash Pumping Station
Onesteel Rooty Hill Detention Tank
2016
Parramatta River Boardwalk Pile Driving
2015
Smeaton Grange – AWS Data Centre Substation & Associated Switching Station
Mt Lock Wind Farm Switching Station
PWCS Floodplain Outlet Structure
Orica Demin Bund
2013
CPP Newcastle 330kV Substation Rebuild
Xstrata Ravensworth North Expansion
2012
Anna Bay 12ML Clearwater Reservoir
2010