Transgrid Required the replacement of 8x Wooden Twin 132kV Pole structures with Concrete Mono poles. The Statement of works (SOW) included; supply 7 installation of permanent steel liners, drilling, form reo and pour of concrete piers, pile caps and pedestals, supply and install of HD bolts. 2x of the poles were direct embedment foundations. Milleen completed the drilling, erection and temp support of the pole butts and concrete backfill. The SOW also included the demolition of the existing timber structures.